Water Resources
The Ntimbale Dam Project on the Tati River was undertaken by the Government of Botswana to improve water supply to villages in the North East District and adjacent villages in the Central District. Knight Piesold implemented feasibility studies, detailed design, and construction supervision.
The East Toba and Montrose Hydroelectric Project is a 235 MW run-of-river green power development that was identified and permitted by Knight Piésold.
The Kwalsa and Upper Stave Hydroelectric project is a renewable energy development that includes six hydroelectric facilities and interconnecting 138 kV transmission line. The Owner, Contractor, Douglas First Nation and Knight Piésold worked closely together to develop two low impact hydroelectric projects overcoming unique challenges while delivering under budget and ahead of schedule.
The Mary River Project is a proposed iron ore mine situated in northwestern Baffin Island in the Qikiqtani Region of Nunavut. The project, if developed, will include an 18 million tonne per year open pit iron ore mining operation, and construction of a 149-kilometre rail line over numerous waterways and continuous permafrost
The Palmarejo Project is a silver-gold mine in the Sierra Madre Occidental mountain range in northwestern Mexico. Knight Piésold has been involved in the tailings and water management aspect of the project through concept development and design.




