Knight Piésold is a multidisciplinary consulting firm that has a long history in water delivery projects across all the integrated engineering fields, and was one of Africa’s foremost pioneers in hydroelectric power, which remains a core focus area to this day. Born in 1921, Knight Piésold is the oldest consulting engineering firm in South Africa, and probably Africa, and built its reputation in the mining sector, where the firm remains a design innovation leader, alongside its other multifaceted specialisations within the world of infrastructure.

Progressive expansion took place in Africa from the early 1920s and globally from the 1950s. “We remain one of the few totally independent, wholly owned South African engineering consulting firms operating worldwide. That’s a significant achievement,” says Leon Furstenburg, director, Knight Piésold, who has been an integral part of the firm’s design and construction management team on some of the Southern African region’s most strategic water projects.

These include the Katse Dam, Matsuko weir and tunnels, the Lesotho Highlands Water Project (LHWP) delivery tunnels and the Mohale Katse tunnel – all part of Phase I of the LHWP (Lesotho Highlands Water Project) and commissioned around 2004. Knight Piésold now forms part of the Metsi a Senqu-Khubelu Consultants joint venture appointed for the design and construction supervision of the Polihali diversion tunnels for Phase II of the LHWP. This JV contract commenced in September 2016 and will be completed in approximately 3.5 years. These diversion tunnels will facilitate construction of the new Polihali Dam, which is central to Phase II and scheduled for construction around 2020.

 

Download the full article.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence