Assessing Credible Modes of Failure: Afton TSF Dam Breach Study

Assessing Credible Modes of Failure: Afton TSF Dam Breach Study

Author: Anna Akkerman, P.Eng., Violeta Martin, Ph.D., P.Eng.
Conference: Tailings and Mine Waste 2015
Date: October 25-28, 2015

The Afton Tailings Storage Facility is located in the semi-arid Interior Region of British Columbia and has been in care and maintenance since 1997, after approximately 20 years of operation. In response to the British Columbia Chief Mine Inspector’s orders issued in August 2014, following a dam breach incident at the Mount Polley Mine, dam breach analysis and inundation studies for the Afton Tailings Storage Facility were conducted.

Defining realistic and credible modes of failure that were consistent with the Canadian Dam Association Dam Safety Guidelines for conducting these studies proved challenging due to the hydrologic conditions and certain features of the Tailings Storage Facility dam design. The selection of initial hydrologic conditions and breach locations has a considerable effect on the predicted volume of tailings mobilized, the characteristics of the flood wave, and the extent of the downstream impact.

Inundation results based on modes of failure that are not credible do not provide real value to the owner, regulators, or the public because they offer little insight into the actual risks posed by a facility. This paper examines the challenges in defining credible modes of failure used in dam breach and inundation studies for mining dams, and presents a case study based on the Afton Tailings Storage Facility.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence