Experience Counts

Experience Counts

Publication: Ekurhuleni Transport
Author: Wayne Hunt
Date: 2016

Ninety-five-year -old Knight Piésold is a Level 2 BBBEE company that places emphasis on staff training, which has helped it to secure several lucrative tenders.

Knight Piésold has been involved with numerous large-scale projects, many of which have been for the South African Roads Agency Limited (Sanral). In fact, Sanral projects account for about 70% of the work the company has done. With a focus predominantly in the northern parts of the country, the company has completed several projects for the provincial governments of Mpumalanga, Gauteng and Limpopo.

In terms of municipal infrastructure, Knight Piésold has also been responsible for the upgrading of the Rosherville Road in City Deep, which is an important part of the city’s inland port, as it accommodates large volumes of heavy trucks.

Knight Piésold was tasked with widening the 1.6 km road, which is owned by the Johannesburg Roads Agency (JRA). Sanral, however, was appointed as the implementing agent and brought in to carry out the project. Work on the road involved in situ recycling of the existing road to a depth of 180 mm, placing a bitumentreated base over it and incorporating a 45 mm asphalt wearing course. Rosherville Road’s lighting had to be moved and service relocations had to be performed. Full access management was also provided at the properties.

 

Download the full article.

Download

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence