Run of River Hydro - Latest Innovations in Diversion Dams and Sediment Exclusion

Run of River Hydro - Latest Innovations in Diversion Dams and Sediment Exclusion

Author: Sam Mottram, Keith Ainsley, Egbert Scherman
Conference: 84th Annual Meeting of International Commission on Large Dams
Date: May 15-20, 2016

ABSTRACT
The exclusion of sediment for hydropower intakes and the flushing of sediment from reservoirs in order to maintain live storage are critical to the long- term viability and sustainability of hydroelectric projects around the World. This paper presents several design innovations and case studies of run-of-river diversion dams and intakes incorporating inflatable rubber dams, vortex de-sanders and Coanda screen intakes for sediment exclusion and flood passage. It presents the findings of physical and CFD model tests, case studies of operating facilities and lessons learned. The projects showcased include:

  • The 147 MW East Toba Hydroelectric Project with inflatable rubber dam for sediment scouring and flood passage.
  • The largest capacity Coanda Screen intake in the World on the 45 MW Kokish River Hydroelectric Project, designed for sediment exclusion and fish passage.
  • Case studies and lessons learned from 8 other run- of- river hydroelectric projects recently constructed that use crest gates (i.e. rubber dams, Obermeyer crest gates or similar) and/or Coanda Screen intakes for sediment flushing and exclusion.

INTRODUCTION
Run-of-river hydroelectric projects typically do not have large storage reservoirs upstream of their intakes, reservoirs that would have sufficient volume and depth to accommodate the exclusion of sediment through settling. Figure 1 below shows the schematic layouts of a typical large hydro storage dam versus a run- of- river hydroelectric facility. A typical run-of-river intake is designed to efficiently divert the hydroelectric project’s generation flow into the water conveyance system and as much as practical eliminate sediment from entering the power facilities. Sediment exclusion for run-of-river intakes has historically been managed using desanding basins, large complex structures that are costly to operate and add significantly to the overall project capital cost.

This paper will illustrate various alternatives to using large desanding basins. These alternatives have proven to be effective at sediment flushing and exclusion, while also being very cost effective and thereby increasing the likelihood of the run-of-river projects being economically viable. Technologies that Knight Piésold have implemented in the design of run-of-river intakes include:

  • Reservoir De-sander Type Intake – using the upstream head pond as the primary sediment settling basin
  • Coanda Screen Type Intake – where a fine screen is used to physically separate sand particles from the diversion flow using the Coanda shear effect
  • Combination of Coanda Screens and Reservoir De-sanding

Several case studies are provided illustrating the application of each technology and the findings of
physical and computer based model testing completed to support each design, as well as the lessons learned from commissioning and operating the facilities.

 

Download the full technical paper.

Download

Perspectivas recientes

Noviembre 2025
Case Study: Assessing Construction-Induced Deformations in Tailings Storage Facility Embankments
Noviembre 2025
Geotechnical Characterization of Cyclone Underflow Tailings under High Confining Pressures
Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Klamath River Renewal Project
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach