Should Upstream Tailings Storage Facilities be Banned?

Should Upstream Tailings Storage Facilities be Banned?

Webinar Moderator: Mining Review Africa
Date: August 21, 2019

Should upstream tailings storage facilities be banned?

Upstream constructed tailings storage facilities (TSFs) have been banned in Chile, Peru and Brazil and there are many other jurisdictions where such designs may not be accepted by Authorities, especially in wet climates and in highly seismically active areas. 

However, in Southern Africa, in semi-arid climates with low seismicity, upstream TSFs are the dominant wall raising method.  This is a very cost-effective method of using the tailings to impound itself, where perimeter deposition results in a segregated beach of coarser tailings in the wall zone, and finer tailings and water in the basin. These have proven to be stable facilities when constructed within design limits, such as low rates of rise with minimal storage of water in the basin.  In other parts of the world upstream TSFs make use of compacted wall raises to progressively impound the tailings.  These too have been successful used in most cases.

Join Knight Piesold in a live interactive webinar where our experts will look at many new TSFs being designed with barrier systems to minimise the risk of groundwater contamination.  Such lining systems introduce a weaker layer under the wall zone (depending on design) making it unsafe to design upstream TSFs. 

Join this discussion to find out:

  • If the risks of designing and operating upstream TSFs now too high?
  • If so, how will the costs of centre-line or downstream TSFs affect the viability of operational and/or new Mines?

Speakers:

Andrew Copeland | Director | Knight Piésold South Africa

Andries Strauss | Manager: Mine Residue section | Knight Piésold South Africa

 

Webinar Recording

 

Perspectivas recientes

Octubre 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
Septiembre 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
Septiembre 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
Septiembre 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
Septiembre 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence