Study of the Behavior of Materials With Fines Content in Heap Leaching Processes

Study of the Behavior of Materials With Fines Content in Heap Leaching Processes

Author: Luis Chahua, Guillermo Barreda, Gavi Sotelo, Miguel Narva
Conference: Heap Leaching Mining Solutions
Date: October 18-20, 2016

ABSTRACT
The geotechnical design for a leach pad requires several different variables to be reviewed during the analysis of the physical stability of the structure. These variables include: 1) the material that comprises the natural foundation; 2) the potential fill material that will form the grading surface; 3) the interface shear strength between the soil liner and the geomembrane; 4) the ore that will be part of the heap; 5) the irrigation rate during the operation and 6) the placement/zoning of material within the heap leach pad.

Typically, the first three variables are controlled during the design and construction of the heap leach pad, while the last three variables are controlled by the mining company as part of their operation process. Simply, we can say that the combination of the last three variables can have a solution flow behavior along the following range: 1) free drainage, if the irrigation rate is applied at a lower enough rate compared to the ore hydraulic conductivity; and 2) pore pressure generation at areas where the irrigation rate is applied exceeding the ore hydraulic conductivity.

This paper presents an analysis of the last three variables taking into account the characteristics of two types of materials available at a mining project: 1) till material with significant fines content and medium to high plasticity; and 2) coarse ore, which corresponds to a material with a maximum size of 6” and low fines content. For the analysis, different mixtures were prepared using these materials in order to obtain the physical characteristics and  hydraulic properties to develop the geotechnical analysis and material zoning/placement within the heap configuration.

Based on the zoning recommendations, the mine developed a large scale leach test in an existing pilot cell in order to evaluate the mixing process and solution flow behavior during the implementation of the leaching process. This consisted of: 1) controlling the flow and volume (input and output); 2) recording the pore pressure readings; 3) electrical resistivity testing and 4) soils classification testing. The results of the pilot cell monitoring and testing are also presented in this document.

 

Download the full technical paper.

Download

 

Perspectivas recientes

Noviembre 2026
Facing a Slithery Dragon: Systematics of the Petracola Ventrimaculata (Boulenger, 1900) Species Complex (Squamata: Gymnophthalmidae) with Description of Five New Species
Octubre 2026
Improving Slope Deformation and Stability Predictions in Anisotropic Rock Masses: A Strain- and Confinement-Dependent Dilation Model for Ubiquitous Joints
Octubre 2026
Integrated Approach to Rapidly Iterate Through LEA Stability Analyses for Design of Staged Construction Over Silty Clay Soils
Octubre 2026
2026 CCE Award of Excellence: Site C Temporary Works
Septiembre 2026
Case Study: Paste Tailings Transport Optimization, Model Calibration and Concentration Sensitivity
Septiembre 2026
Multiple Account Analysis of Tailings Technologies to Define the Next TSF Stages
Septiembre 2026
Climate Change Considerations in Mine Water Management and Engineering Design for Reclamation Planning
Agosto 2026
Beyond the Design Storm: From Compliance Metrics to Adaptive Operations for Consecutive Minor Events in Dams
Agosto 2026
Knight Piésold: Engineering Namibia's Future
Julio 2026
Knight Piésold: Driving Integrated Water Management for Mining's Future
Julio 2026
Stochastic Hydrology Reveals the Controls of Forest Harvesting - Peakflow Causal Relations in Snow-Transient Environment
Junio 2026
From Liability to Asset: A Sustainable Approach for Mine Tailings Remediation in Peru
Junio 2026
Unsaturated Shear Strength Characteristics of Filtered Tailings through Modified Direct Simple Shear (MDSS) Apparatus
Mayo 2026
Building Resilient Mines: Knight Piésold's Multidisciplinary Engineering Expertise
Abril 2026
Considerations in the Design and Construction of Ventilation and Surge Shafts for the uMWP Phase 1 Water Transfer Tunnel
Abril 2026
Design Considerations and Construction Strategies for the uMkhomazi Water Project Phase 1
Abril 2026
The uMkhomazi Transfer Tunnel: Background, Geotechnical Conditions and Tunnel Design Considerations
Marzo 2026
Influencia de la interfaz en la estabilidad de un patio de lixiviación: un análisis de sensibilidad
Marzo 2026
Evaluación de alternativas para TSF mediante análisis de cuentas múltiples: selección de ubicación y método constructivo
Marzo 2026
El DAR como pilar de la gobernanza: GISTM: evaluación del impacto acumulativo del desviaciones en la gestión proactive de riesgos de depositos de jales. Estudio de caso.