ABSTRACT
The geotechnical design for a leach pad requires several different variables to be reviewed during the analysis of the physical stability of the structure. These variables include: 1) the material that comprises the natural foundation; 2) the potential fill material that will form the grading surface; 3) the interface shear strength between the soil liner and the geomembrane; 4) the ore that will be part of the heap; 5) the irrigation rate during the operation and 6) the placement/zoning of material within the heap leach pad.

Typically, the first three variables are controlled during the design and construction of the heap leach pad, while the last three variables are controlled by the mining company as part of their operation process. Simply, we can say that the combination of the last three variables can have a solution flow behavior along the following range: 1) free drainage, if the irrigation rate is applied at a lower enough rate compared to the ore hydraulic conductivity; and 2) pore pressure generation at areas where the irrigation rate is applied exceeding the ore hydraulic conductivity.

This paper presents an analysis of the last three variables taking into account the characteristics of two types of materials available at a mining project: 1) till material with significant fines content and medium to high plasticity; and 2) coarse ore, which corresponds to a material with a maximum size of 6” and low fines content. For the analysis, different mixtures were prepared using these materials in order to obtain the physical characteristics and  hydraulic properties to develop the geotechnical analysis and material zoning/placement within the heap configuration.

Based on the zoning recommendations, the mine developed a large scale leach test in an existing pilot cell in order to evaluate the mixing process and solution flow behavior during the implementation of the leaching process. This consisted of: 1) controlling the flow and volume (input and output); 2) recording the pore pressure readings; 3) electrical resistivity testing and 4) soils classification testing. The results of the pilot cell monitoring and testing are also presented in this document.

 

Download the full technical paper.

Download

 

Perspectivas recientes

Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Septiembre 2024
Grouting to reduce seepage at Neckartal Dam, Namibia
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
A Diverse Approach in Geosynthetic Barrier Systems to Ensure Environmental Compliance of Existing TSFs
Julio 2024
Case History: Application Of Geosynthetics in A Tailings Storage Facility Rockfill Buttress Construction Project
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Challenges in Ensuring Stability Whilst Providing Environmental Compliance for Existing TSFs