Study of the Behavior of Materials With Fines Content in Heap Leaching Processes

Study of the Behavior of Materials With Fines Content in Heap Leaching Processes

Author: Luis Chahua, Guillermo Barreda, Gavi Sotelo, Miguel Narva
Conference: Heap Leaching Mining Solutions
Date: October 18-20, 2016

ABSTRACT
The geotechnical design for a leach pad requires several different variables to be reviewed during the analysis of the physical stability of the structure. These variables include: 1) the material that comprises the natural foundation; 2) the potential fill material that will form the grading surface; 3) the interface shear strength between the soil liner and the geomembrane; 4) the ore that will be part of the heap; 5) the irrigation rate during the operation and 6) the placement/zoning of material within the heap leach pad.

Typically, the first three variables are controlled during the design and construction of the heap leach pad, while the last three variables are controlled by the mining company as part of their operation process. Simply, we can say that the combination of the last three variables can have a solution flow behavior along the following range: 1) free drainage, if the irrigation rate is applied at a lower enough rate compared to the ore hydraulic conductivity; and 2) pore pressure generation at areas where the irrigation rate is applied exceeding the ore hydraulic conductivity.

This paper presents an analysis of the last three variables taking into account the characteristics of two types of materials available at a mining project: 1) till material with significant fines content and medium to high plasticity; and 2) coarse ore, which corresponds to a material with a maximum size of 6” and low fines content. For the analysis, different mixtures were prepared using these materials in order to obtain the physical characteristics and  hydraulic properties to develop the geotechnical analysis and material zoning/placement within the heap configuration.

Based on the zoning recommendations, the mine developed a large scale leach test in an existing pilot cell in order to evaluate the mixing process and solution flow behavior during the implementation of the leaching process. This consisted of: 1) controlling the flow and volume (input and output); 2) recording the pore pressure readings; 3) electrical resistivity testing and 4) soils classification testing. The results of the pilot cell monitoring and testing are also presented in this document.

 

Download the full technical paper.

Download

 

Recent Insights

April 2026
Considerations in the Design and Construction of Ventilation and Surge Shafts for the uMWP Phase 1 Water Transfer Tunnel
April 2026
Design Considerations and Construction Strategies for the uMkhomazi Water Project Phase 1
April 2026
The uMkhomazi Transfer Tunnel: Background, Geotechnical Conditions and Tunnel Design Considerations
March 2026
Influence of the Interface on the Stability of a Heap Leach Pad: A Sensitivity Analysis
March 2026
Evaluation of Alternatives for TSF Using Multiple Account Analysis: Selection of Location and Construction Method
March 2026
DAR as a Pillar of GISTM Governance: Evaluation of the Cumulative Impact of Deviations in Proactive Tailings Risk Management. Case Study.
February 2026
A Method to Assess the Feasibility of Injection Leaching on Heap Leach Slopes
January 2026
Knight Piésold: Expanding Engineering Solutions Amid Africa's Mining Evolution
November 2025
Case Study: Assessing Construction-Induced Deformations in Tailings Storage Facility Embankments
November 2025
Geotechnical Characterization of Cyclone Underflow Tailings under High Confining Pressures
October 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
September 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
September 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
September 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
September 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
September 2025
Klamath River Renewal Project
September 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
September 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
September 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
September 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis