The existing Foskor Conveyor 101’s main support trestle was damaged due to a combination of lateral loading of the stockpile and dozing machinery. It was decided by Foskor Limited that the remedial work on the structure be done as soon as possible since the structure is considered unstable.
Knight Piésold provided civil and structural engineering design and construction quality assurance services for the assessment, design, and construction phases to make the main support trestle’s foundation and steel structure safe.