The project is located in the Ingquza Hill Local Municipality in the OR Tambo District in the Eastern Cape. The section of the road extends from the Msikaba River at km 35.3, to the Mtentu River at km 52.8 in the Transkei towards the east of the Eastern Cape province. The total length of final toll road will be approximately 410 km. The project is currently in the preliminary design phase. Construction began in early 2019 and will take five years to complete.
The major aspects of this project include the following: