Case History: Application Of Geosynthetics in A Tailings Storage Facility Rockfill Buttress Construction Project

Case History: Application Of Geosynthetics in A Tailings Storage Facility Rockfill Buttress Construction Project

Authors: M. K. Mthethwa11
Conference: GIGSA Workshop and GCYP
Date: July 4-5, 2024

1 Knight Piésold, Sandton, South Africa

ABSTRACT

The objective of this paper is to present the application of geosynthetics in the buttressing of a gold tailings dam in 2022 in an undisclosed location in Free State, South Africa. Several geosynthetic materials were involved in the project such as geogrids, non-woven geotextiles, HDPE drainage pipes, and a geo-composite drainage. Drainage of the saturated in-situ clay was achieved using sub-soil drains consisting of a slotted HDPE pipe wrapped in non-woven geotextile for filtering function. Biaxial geogrid reinforcement was used to protect the subsoil drain from crushing under the weight of the overburden rockfill. Non-woven geotextile and geocomposite drain were used as a separator and filter material between the tailings and rockfill. The application of geosynthetics in this project was successful as the products proved functional post-construction based on available monitoring data.

 

Download the full paper.

Download

Recent Insights

October 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
September 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
September 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
September 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
September 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
September 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
September 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
September 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
September 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
September 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
August 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
August 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
July 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
July 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
June 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
June 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
June 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
May 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
April 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
November 2024
Knight Piésold: Commitment to African Excellence