Construction Supervision of a Zinc Tailings Storage Facility and Return Water Dam

Construction Supervision of a Zinc Tailings Storage Facility and Return Water Dam

Author: Antonie Van Der Westhuizen
Conference: 6th International Mining and Industrial Waste Management Conference
Date: October 29-31, 2018

ABSTRACT
One of the largest diversified natural resource companies required a 110-hectare tailings storage facilities (TSF) as part of the new Zinc mine in the Northern Cape, South Africa. This facility and return water dam (RWD) were required to be covered by 1.5mm HDPE smooth and 1.5mm HDPE double textured geomembrane in specific areas to make up the barrier system. The main objective of the barrier system is to contain the slurry being deposited to ultimately prevent groundwater contamination. The geomembrane used in these facilities had to be securely connected to the various components making up the TSF and RWD. The in-situ basin material contained nodular calcrete that created challenges for surface preparation. In areas where the surface specification couldn’t be met, a geotextile (300 GSM non-woven, needle punched) protection layer had to be implemented into the design and be deployed on site to prevent puncture damage to the primary geomembrane.

 

Download the full technical paper.

Download

 

Recent Insights

November 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
November 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
November 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
September 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
August 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
July 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
May 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation