Design of a Centerline Method Tailings Dam using Mine Waste Rockfill in Perú

Design of a Centerline Method Tailings Dam using Mine Waste Rockfill in Perú

Author: Paul W. Ridlen, Thomas Kerr,  Gilberto Dominquez, Jean-Baptiste Varnier
Conference: Tailings and Mine Waste 2018
Date: September 30-October 2, 2018

ABSTRACT
The Constancia tailings facility, located in the Peruvian Andes, was designed to store more than 450 million tonnes of copper tailings in an area of relatively high seismicity and seasonally high rainfall. The tailings dam, currently more than 100 meters high, is constructed of compacted rockfill sourced from glacial outwash, quarried sandstone, and open-pit waste rock, and will ultimately be raised to a height greater than 170 meters. The dam comprises an initial downstream-method rockfill embankment with sloping upstream core and chimney drain, with subsequent conversion to a centerline-method, supported by an upstream rockfill platform to provide support to the vertical section of core and filter/drain zones. This paper provides a summary of the design analyses and describes observations made during construction and operation. Site-specific deterministic and probabilistic seismic hazard analyses, seep-age, slope stability, and deformation analyses performed to predict the long-term engineering behavior of the dam and impounded tailings are described.

 

Download the full technical paper.

Download

 

Recent Insights

November 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
November 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
November 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
September 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
August 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
July 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
May 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation