Hydrodynamic Modelling of Intakes for Run-of-River Hydroelectric Projects

Hydrodynamic Modelling of Intakes for Run-of-River Hydroelectric Projects

Author: V. Martin
Conference: Canadian Hydrotechnical Conference 2015
Date: April 29-May 2, 2015

Run-of-river, diversion-type hydroelectric projects on steep mountainous streams create changes in environmental conditions, including modified hydraulic and sediment transport conditions in the headpond upstream of the flow diversion intake and in the diversion section of the stream between the intake and the tailrace. These types of changes can lead to environmental and operational challenges that require careful consideration at the project design stage in order to achieve a successful, sustainable project. Hydrodynamic modelling including two dimensional and Computational Fluid Dynamics (CFD) modelling were used to investigate the flow and sediment transport patterns through the headponds and intake structures of one existing and two proposed run-of-river hydroelectric projects located in coastal British Columbia. The intake structures consist of a concrete weir, a Coanda screen or an inflatable rubber weir, an intake facility with conveyance to the penstock entrance, and sluicing facilities for flushing sediment from the headpond. This paper reviews the relevant environmental, engineering and modelling issues for each project and discusses how results from these numerical modelling tools were used in fine-tuning the intake designs.

 

Download the full technical paper.

Download

Recent Insights

November 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
November 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
November 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
September 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
August 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
July 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
May 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation