A Brief History of the RCC at Neckartal Dam

A Brief History of the RCC at Neckartal Dam

Author: Edwin Lillie, Elvin Pesch, Louis Barnard
Conference: SANCOLD Annual Conference and AGM 2018
Date: November 7-9, 2018

ABSTRACT
The construction of Neckartal Dam started in September 2013. The full-scale trial section was done in August 2015 and the first RCC was placed on the dam foundation in October 2015. The RCC placement was completed 32 months later in May 2018. This paper gives a brief history of the RCC through the various project phases. Two mixes were used, a 20/38 high cementitious mix for an impermeable zone (Zone 1) in the upstream face of the dam and two 10/38 low cementitious mixes for the main body of the dam (Zone 2). The Contractor produced a total of 3.12 million tons of aggregate for the project over 33 months at an average of 94 800 tons per month. The overall crushing plant efficiency over the 33 months of production was 33%. The Contractor produced a total of 836 000m3 of RCC for the project over 32 months at an average rate of 26 127m3 per month. The overall plant efficiency over the 32 months was 17%. Over the whole RCC placement period, there were interruptions for many reasons, some within the Contractor’s control such as plant breakdowns, insufficient sand, cement and/or fly ash, waiting for shutters to be moved, preparing RCC surfaces, sequencing of the intake tower construction etc. There were also some delays beyond the Contractor’s control such as strikes, break downs and late payments. The RCC cube tests indicated that the set RCC easily achieved the strength requirements of the project specification of 20MPa at 365 days for Zone 1 and 10MPa at 365 days for Zone 2.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation
Febrero 2024
Empoderamiento y Resiliencia
Enero 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
Enero 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects