Applying the Rational Quantitative Optimal Risk Approach to Optimize Rehabilitation for a Portfolio of Dams

Applying the Rational Quantitative Optimal Risk Approach to Optimize Rehabilitation for a Portfolio of Dams

Author: G. C. Cloete, J. V. Retief, C. Viljoen
Conference: AFRICA 2017
Date: March 14-16, 2017

ABSTRACT
The Rational Quantitative Optimal (RQO) approach to risk based dam safety produces a definitive result for an assessment of the reduction of risk from the overtopping of embankment dams. The model is applied to 3 embankment dams in Namibia.

The model is based on principles of risk, but an assessment of a portfolio of dams provides discrete optimal results, not expressed in terms of probability. The model provides a transparent framework for decision making related to public safety, which will also appeal to the technically minded portfolio manager looking for a purely quantitative procedure.

The RQO approach relates the probability of occurrence of a flood, which exceeds the spillway capacity, to the cost of fractionally raising the non-overspill crest to accommodate the flood. By applying this relationship to a range of raised levels, the risk characteristics of a dam can be obtained as a technology curve. A portfolio of technology curves for several dams provides a tool for decision makers regarding priority and extent of rehabilitation.

 

Download the full technical paper.

Download

 

Perspectivas recientes

Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation
Febrero 2024
Empoderamiento y Resiliencia
Enero 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
Enero 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects