Assessment of Leach Ore Dry Unit Weight and Hydraulic Performance

Assessment of Leach Ore Dry Unit Weight and Hydraulic Performance

Author: Peter D. Duryea
Conference: Tailings and Mine Waste 2019
Date: November 17-20, 2019

Proper design of a heap leach facility requires the development of a leach ore loading plan that can accommodate its ultimate capacity. The loading plan and associated capacity assessments will be more representative of actual field performance if they consider the variation in leach ore dry unit weight over time as the heap is loaded and the leach ore compresses under self-weight. That can be accomplished by careful evaluation of results from laboratory testing of representative samples of the leach ore.

Rigid wall permeability testing provides data about dry unit weight (and hence void ratio), saturated hydraulic conductivity, and vertical effective confining stress. These data can be fitted to relationships for compressibility (void ratio as a function of effective confining stress) and conductivity (saturated hydraulic conductivity as a function of void ratio) that were originally developed for self-weight consolidation of soft, fine-grained soils, e.g., tailings. The forms of those equations also typically fit laboratory test data from coarse-grained leach ore.

Once the compressibility and conductivity relationships are defined, incremental stress calculations with a spreadsheet allow for the development of: (1) profiles of dry unit weight and saturated hydraulic conductivity with depth in a unit area column of leach ore; and (2) the variation in depth-weighted average dry unit weight with average heap height. The average dry unit weight relationship may then be incorporated into heap loading plans and capacity assessments. Comparison of the planned leach application rate to the anticipated saturated hydraulic conductivity of the leach ore under the maximum heap height, assuming vertical percolation under unit hydraulic gradient, also provides a preliminary assessment of hydraulic performance.

Results for two case studies, including both a crushed and agglomerated copper heap and a run-of-mine gold heap, are presented. Actual results from mine production records compare well with predictions, although assessment of the run-of-mine gold heap required additional refinement to adjust for the effects of oversize material that could not be incorporated into the laboratory-scale testing.

 

Download the full technical paper.

Download

Perspectivas recientes

Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence
Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Grouting to Reduce Seepage at Neckartal Dam, Namibia
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality