CDA Technical Bulletin on Tailings Dam Breach Analyses

CDA Technical Bulletin on Tailings Dam Breach Analyses

Author: V. Martin, M. Al-Mamun, A. Small
Conference: 87th Annual Meeting of the International Commission on Large Dams
Date: June 9-14, 2019

ABSTRACT
Understanding the consequences of a tailings dam breach ultimately leads to designing safer dams and properly preparing for emergencies. Guidelines for dam breach studies are available for water dams, but none of these deal with the hydrodynamic and geotechnical issues related to tailings flows. Since 2013, the Mining Dams Committee of the Canadian Dam Association (CDA) has been working on developing methodologies to improve the way tailings dam breach analyses (TDBA) are conducted. Workshops were organized in 2014 and 2015 to understand the state of practice at the time. In 2016 a CDA Working Group was established to develop guidelines specific to tailings dams. The Working Group led the development of the TDBA Bulletin and feedback was obtained on several drafts including a workshop in 2017.

The CDA Technical Bulletin for TDBA will provide the key steps that should be undertaken. The differences between water retaining and tailings dams will be addressed. The presence of a supernatant pond and the potential of the tailings to liquefy and flow, are the key parameters influencing the runout potential and outflow volume. The physical processes occurring during a TDBA will be discussed with guidance provided on estimating the volume of released tailings during a breach and predicting where the tailings could flow. The TDBA is planned to be issued in 2019.

 

Download the full technical paper.

Download

Perspectivas recientes

Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation