Design Considerations for the Capilano Energy Recovery Facility and Break Head Tank

Design Considerations for the Capilano Energy Recovery Facility and Break Head Tank

Author: Rob Adams
Conference: HydroVision 2017
Date: June 27-30, 2017

INTRODUCTION
Metro Vancouver (MV) is a public works organization that serves 18 municipalities (over 2 million people) in the greater Vancouver region of British Columbia, Canada. Amongst numerous other functions including waste collection and disposal, one of its primary tasks is to reliably provide clean, potable drinking water (over 1.1 million m3 per day average) to the residents of the cities served through a system of reservoirs, treatment facilities, pump stations and piping networks.

Most of Vancouver’s drinking water supply comes from watersheds in the mountains on the north side of the city (North Vancouver). Three main watersheds collect fresh water in three primary reservoirs. The reservoirs are protected and the water supply has historically been clean, with little need for elaborate treatment facilities. However, issues with turbidity, though not directly affecting potability, led in the 1990’s to the planning of a Filtration Plant to serve the Capilano and Seymour reservoirs (Seymour-Capilano Filtration Project, SCFP).

 

Download the full technical paper.

Download

Perspectivas recientes

Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence
Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Grouting to Reduce Seepage at Neckartal Dam, Namibia
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality