Deterministic Lake and Stream Temperature Modelling: Maintaining Optimal Water Temperatures for Kokanee and Rainbow Trout through Informed Design

Deterministic Lake and Stream Temperature Modelling: Maintaining Optimal Water Temperatures for Kokanee and Rainbow Trout through Informed Design

Author: Alana Shewan, Anna Akkerman, Violeta Martin
Conference: CSCE Annual Conference 2017 / 23rd Canadian Hydrotechnical Conference
Date: May 31-June 3, 2017

ABSTRACT
Stream temperature is an important indicator of habitat quality for fish of all life stages. However, stream temperature is often overlooked when designing mitigation systems, with the focus being on the effects of development on stream flow, depth and velocity. A number of simple deterministic water temperature models exist for lakes, channels, and pipelines that can be utilized to optimize key design parameters for mitigation systems.

Knight Piésold Ltd. (KP) used water temperature modelling to support the preliminary design of a water supply system for a proposed mine in BC. The water supply system will augment flows to an existing stream to support kokanee and rainbow trout populations. The proposed water supply system includes an intake in a nearby lake, a pump and pipeline conveyance system, and a small reservoir with low level and surface outlets.

KP modelled the water temperatures throughout the supply system and in the receiving stream using three models: a one-dimensional Fresh Water Lake model (FLake), a heat transfer pipeline model, and the Stream Segment Temperature model (SSTEMP). Baseline models of the existing lake and stream were completed to assess model suitability and to calibrate model parameters. Operation models were then developed using long-term site specific climate inputs for the project. The models were run with various design considerations to maintain stream temperatures within optimal ranges to support various life stages of the kokanee and rainbow trout populations. Modelling identified those periods in which conditions similar to baseline could not be fully achieved and additional mitigation measures were required.

 

Download the full technical paper.

Download

Perspectivas recientes

Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence
Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Grouting to Reduce Seepage at Neckartal Dam, Namibia
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine