ABSTRACT

New Gold’s New Afton Mine is an operating gold-copper block cave mine located 10 km west of Kamloops, British Columbia, Canada. Block 3 (B3) mining was initiated in June 2021 and comprised New Afton’s second lift, located approximately 750 metres below ground and partially beneath the previously mined Lift 1 West Cave (600 m below ground). B3 cave propagation resulted in mobilization of the overlying Lift 1 extraction level and existing muckpile, with increasing subsidence observed on surface. The timing and extent of B3 cave progression and initial subsidence expression are interpreted to have been significantly influenced by pre-existence of broken, mobilized material within the overlying West Cave muckpile and its associated subsidence zone. Initial minor subsidence deformations from B3 mining were observed throughout the existing West Cave subsidence zone as the B3 cave initially yielded an intact orebody region adjacent to West Cave, resulting in limited remobilization of the West Cave muckpile along its westernmost boundary. More significant, accelerating surface deformations were observed as the B3 caved zone fully-mobilized the Lift 1 extraction level and the overlying West Cave muckpile.

State-of-the-art block cave and subsidence monitoring programs have been implemented at New Afton to track cave propagation and subsidence progression in response to mining, including towards critical surface infrastructure. This paper summarizes observed B3 cave propagation and initial subsidence manifestation, using examples from the available instrumentation and monitoring techniques. Application of each monitoring technique to observation-based interpretation of the conceptual B3 block cave (i.e., seismogenic, yielded, and caved zones) and subsidence zone (i.e., crater, fractured, and continuous zones) subcomponents is also presented.

REFERENCE

Davenport, K., & Kamp, C., Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine, in Johansson, D., & Schunnesson, H. (Eds.). (2024). Proceedings of the 9th International Conference and Exhibition on Mass Mining, MassMin 2024. pp. 1239-1254, https://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-110088 

 

Download the full paper from the link below.

Download

Perspectivas recientes

Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation