Managing Excessive Pit Wall Deformation of Weak Rock Mass

Managing Excessive Pit Wall Deformation of Weak Rock Mass

Authors: Salina Yong, Daniel Yang, Justine Ealy, Christina Foster
Conference: International Slope Stability 2022 Symposium
Date: October 17-21, 2022

ABSTRACT

Rapid acceleration of a large-scale creeping instability occurred in an open pit operation in 2016. A 150-foot-tall back scarp formed, tension cracks appeared near the pit rim, bulging formed in the lower slope, and debris reached the pit bottom. The instability displaced material over a hundred feet and buried the main access road. Monitoring of the initially slow-moving mass had commenced in 2013 with terrestrial radar, which was integral to managing the risk along with strategic mine planning. As a result, the instability was successfully managed and did not lead to safety incidents or equipment losses. Re-establishing access necessitated routing through the slide debris, which posed a risk to the road development due to the potential of heightening the back scarp. Dewatering and removal of the slide toe also posed risks to the road development and mine economics.

Analyses were completed to evaluate the stability of the back scarp and the proposed mining sequence of the slide toe with UDEC, RocFall, and Slide3. The analyses assisted rehabilitation by identifying influential factors, estimating the rockfall impact, and identifying areas of concern. The pit was successfully rehabilitated, not only with the insights provided by the analyses but also the vigilant guidance provided by the mine geotechnical team through real-time slope monitoring and inspections, continuous maintenance, and a flexible mindset for impromptu adjustments when needed. Mining of the pit was completed in 2020 and backfilling is ongoing. Recent monitoring data indicates the instability has stabilized at a displacement rate of nearly zero. This paper summarizes a case history where excessive deformation of a pit wall exposed in weak rock mass was successfully managed.

 

Download the full paper.

Download

Perspectivas recientes

Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence
Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Grouting to Reduce Seepage at Neckartal Dam, Namibia
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality