Mount Polley Tailings Dam Failure - More Lessons to Learn

Mount Polley Tailings Dam Failure - More Lessons to Learn

Author: Ken J. Brouwer, Greg L. Smyth 
Conference: CIM 2017 Convention
Date: April 30-May 3, 2017

ABSTRACT
The Mount Polley Tailings Facility was first constructed in 1996 at a time when three new mines were under development in BC, Canada (Mount Polley, Huckleberry and Kemess South). The design, review and regulatory oversight of these three projects were influenced by tailings facility failures that had occurred at that time (Merriespruit, South Africa (1994), Omai, Guyana (1995)). Qualified geotechnical engineers developed designs, Independent  ngineering Reviews were conducted, and enforcement of mining regulations occurred with strong participation by the Provincial Government. The concurrent development of these mines allowed for lessons learned from one project to be applied to the others. For example, foundation instability in glaciolacustrine soils encountered during construction of the starter dam at the Kemess Tailings Facility resulted in review of similar glaciolacustrine soils at the Mount Polley Tailings Facility, and the early embankment designs incorporated suitably flat and/or buttressed slopes to accommodate the potentially weak foundation conditions. The Mount Polley dam failure occurred after the facility design was modified by incorporating steeper overall slopes for the higher embankments. Recent regulatory changes in BC mandate Independent Review Boards along with increased inspections by Regulators for tailings facilities. This will result in more conservative designs with increased oversight during all phases of mine operations, in order to foster a safer mining industry.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation
Febrero 2024
Empoderamiento y Resiliencia
Enero 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
Enero 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects