Neckartal Dam, the Design & Supply of the Hydro Mechanical Equipment

Neckartal Dam, the Design & Supply of the Hydro Mechanical Equipment

Author: Edwin Lillie, Guido Scalzi
Conference: AFRICA 2019
Date: April 2-4, 2019

Neckartal Dam is located on the Fish River, a tributary of the Orange River. The construction of Neckartal Dam started in September 2013. It will be the largest dam in Namibia and the eighth largest dam in Southern Africa by storage volume. Neckartal Dam is primarily for irrigation. Water is released from the dam and abstracted some 13km downstream from a weir. From there it is pumped to a balancing dam above the irrigation area. There is a mini hydropower station at the dam to generate electricity from the irrigation releases. Although the civil works make up the largest proportion of the capital cost of the project, the hydro mechanical equipment is vitally important to the success of the project. This paper gives a description of the hydro mechanical equipment for the project, the contractual arrangements to procure and install it, some of the important specifications used for the design and manufacture of the equipment and the quality assurance methods used to ensure that the equipment meets the long-term project requirements. Figure 1 shows the downstream view of the dam and outlet works taken from a drone.

 

Download the full technical paper.

Download

Perspectivas recientes

Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation