Northern Mineral Development: We All Need to Have Skin in the Game

Northern Mineral Development: We All Need to Have Skin in the Game

Publication: Global Business Reports
Issue: February 2015
Issue Title: Circumpolar Mining 2015

All stakeholders involved in northern mineral development have a role to play in positively advancing an industry that represents an opportunity for socio-economic development. Mining has the potential to bring self-sufficiency to the North; empower people with education, training, and employment; increase territorial revenues; and support infrastructure development. In the author’s experience as an environmental assessment (EA) practitioner working on resource projects across Canada`s north, elders have consistently stressed that their youth need the opportunities of a modern economy to be productive and raise healthy families. It is imperative that we explore how stakeholders can work together to support responsible northern development that values traditions and the environment.

Northern mineral development has over a 100-year heritage, with a handful of environmental legacies. However, it is mining`s dirty history that has transformed it into a leader in environmental stewardship today. Regulatory regimes in the North are less than two decades old, involving made-in-the-north land use planning and EA processes that emphasize the integration of local knowledge and perspectives. Successful projects demonstrate sensitivity to northern concerns and maximize the involvement of, and support and benefit for local people.

Circumpolar regions are underexplored and present “low hanging fruit” for explorers, as they prospect with bedrock close to the ground surface. However, the remoteness from southern markets and populations, a lack of transportation infrastructure, short seasonal windows, and extreme cold make these regions expensive to explore and develop. Other challenges include typically scarce, pre-existing environmental baseline information, potential wealth of traditional knowledge to collect and consider, and communities that have limited experience with mining.

 

Download the full article.

Download

Perspectivas recientes

Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation