Presenting a Case for Two Closure Approaches

Presenting a Case for Two Closure Approaches

Author: Richard J Frechette
Conference: 1st International Congress on Planning for Closure of Mining Operations
Date: November 20-22, 2016

ABSTRACT
This articles makes a case for two closures approaches: (1) a plan developed pre-mining; or (2) a plan developed during late operations or post?mining. A pre-mining closure plan that dovetails with a tailored operating plan can achieve goals with modest and low-volatility post-mining capital expenditure. A post-mining closure plan can capitalize on practical yet innovative techniques to yield best-achievable results with the resources available.

Either case has its place for consideration depending upon where on the timeline the mine owner has taken possession of the property. In the first case, the closure obligation can be closely managed during operations by careful execution of a holistic plan that integrates purposeful operating activities to advance closure efforts and reduce associated costs incurred post?operations. It can be demonstrated that any closure plan can be implemented at lower cost if operations are modified to cater to specific, even if limited, aspects of the closure plan. In the second case, practical objectives can be developed and achieved with a realistic understanding of techniques and activities that can be successfully executed under the circumstances that exist at actual mine closure. One of the keys to success if following this second approach is to employ a skilled and experienced practitioner of closure planning.

The situations that lead to the circumstances where each case is applicable and the general thought process that may be employed are explained in this article. Some practical examples of closure elements to consider and how they can be used to bolster the argument for each case are provided to equip the reader with concrete illustrations.

 

Download the full technical paper.

Download

Perspectivas recientes

Septiembre 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
Septiembre 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
Septiembre 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
Septiembre 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
Agosto 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
Julio 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
Julio 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
Junio 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
Junio 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
Junio 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
Mayo 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
Abril 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
Noviembre 2024
Knight Piésold: Commitment to African Excellence
Noviembre 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
Noviembre 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
Noviembre 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Grouting to Reduce Seepage at Neckartal Dam, Namibia
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality