Review of Risk Management and Regulatory Framework of Mine Waste Facilities in Zambia

Review of Risk Management and Regulatory Framework of Mine Waste Facilities in Zambia

Author: Patrick Tembo, Gibson Mupeyo, Chalwe Bulaya, Boston Katongo
Conference: Zambia Chamber of Mines’ 4th National Conference on Occupational Health, Safety and Environment
Date: November 1-2, 2018

ABSTRACT
Fatal and life threatening incidences related to mine waste facilities occurring in the mining sector worldwide are a source of concern to the industry. Despite the implementation of management strategies and enforcement of relevant pieces of legislations, fatalities associated with the operations of mine waste facilities have continued to befall the mining sector.

In view of continued occurrence of fatal incidences at mine waste facilities, there is particular concern regarding the need to adopt adequate risk management strategies and regulatory frameworks for management of mine waste facilities. Evidence shows that generally mine waste facility management has not been given the necessary attention it deserves. This is attributed to Mine Waste being at the last part, or rather the “tail-end” of mining and mineral processes. In addition, the regulatory framework on the management of mine waste facilities is seemingly inadequate when it comes to implementation. There is also no country or country-customised standards setting out risk and general management requirements for the mine waste facilities.

It is therefore critical that adequate Best Available Technologies and Practises of risk management are documented and effectively implemented to prevent fatal incidences and injuries associated with mine waste facilities. In addition, the regulatory framework should adequately deter mine owners from neglecting responsible management of their mine waste facilities.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation
Febrero 2024
Empoderamiento y Resiliencia
Enero 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
Enero 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects