ABSTRACT
On 27th February 2014 solids were noted to be discharging into the Return Water Dam below the Selati Tailings Dam at Foskor in Phalaborwa, indicating a decant failure. All parties involved reacted quickly to curb the discharge of solids and minimize the risk of catastrophic failure of the facility. Within days, a temporary filter was constructed on the outlet, followed by the design and construction of a medium term filter, while a solution is being sought for the permanent sealing of the decant outlet.

COMPANY BACKGROUND
Foskor (Pty) Ltd is a company whose primary focus is the production and marketing of Phosphoric acid and related products, consisting of two divisions situated in Phalaborwa and Richards Bay respectively. Phosphate rock is supplied by Foskor Phalaborwa to Foskor Richards Bay, where Phosphoric Acid and granulated fertilizer is manufactured.

The Phalaborwa division consists of Mining, Communition & Beneficiation, and Tailings management, and the Richards Bay division is divided into Phosphoric Acid, Sulphuric Acid and Granulation production. The Phalaborwa Operation produces approximately 2.1 million tons of phosphate annually. As part of the mining process, approximately 45,000 tons of mine residue need to be disposed daily on mine residue facilities.

The Phalaborwa operations are currently using the Selati and Southern Tailings dams for this purpose. The Selati Tailings Dam (Selati TD) covers approximately 1,110 hectares and the Southern dam (Southern TD) covers about 244 hectares.

Tailings are mainly deposited on the Selati tailings dam with the Southern dam serving as a bypass capacity in case problems are experienced at the Selati Transfer pump station. Tailings are deposited via 1 m diameter cyclones which are fed from the Tailings Transfer Pump Station by way of 5 feed lines installed to distribute tailings material around the facility.

 

Download the full technical paper.

Download

Perspectivas recientes

Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation
Febrero 2024
Empoderamiento y Resiliencia
Enero 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
Enero 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects