Tailings Impoundment Stabilization to Mitigate Mudrush Risk

Tailings Impoundment Stabilization to Mitigate Mudrush Risk

Author: Amy Adams, Daniel Friedman, Ken Brouwer, Scott Davidson
Conference: ICOLD 2017 Annual Meeting
Date: July 3-7, 2017

ABSTRACT
Historical tailings impoundments may contain saturated semi-fluid materials at depth, long after tailings deposition has ceased and after surface reclamation has been completed. These saturated materials can liquefy and flow if the impoundment is breached. A historical tailings pile can represent a risk to an underground mine development if there is potential for the mine development to generate a propagating zone of cracking and/or surface subsidence that ultimately interacts with the historical tailings impoundment. The risk of a sudden mudrush breach can be mitigated by reducing the potential for the tailings to flow. This paper presents a case study for the New Afton Mine located in British Columbia, Canada. A rheological model was developed to characterize the yield stress and flowability of a historic tailings deposit. In-situ and laboratory testing was completed to understand the variability between sandy tailings, deposited as above or below water beaches, and finer tailings ‘slimes’, deposited further from the deposition points. Simple index properties such as moisture content and clay-sized fraction were used to characterize the tailings rheology. A field-scale trial program was implemented to demonstrate that the tailings could be quickly and effectively densified and dewatered using wick drains, consolidation loading, and dewatering wells.

 

Download the full technical paper.

Download

 

Perspectivas recientes

Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation
Febrero 2024
Empoderamiento y Resiliencia
Enero 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
Enero 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects