ABSTRACT

The publication of the Global Industry Standard on Tailings Management (GISTM) in August 2020, and supporting documentation from the International Council on Mining & Metals (ICMM) in May 2021, have had a profound impact on the mining industry. Mine operators around the world are striving to improve their governance, engineering, and operational practices for tailings management to align with the aspirational goals of the GISTM.

Even with the benefit of the ICMM Tailings Management Good Practices Guide and Conformance Protocols, Mining Association of Canada (MAC) with Towards Sustainable Mining (TSM) Tailings and Operation, Maintenance, and Surveillance (OMS) guides, as well as existing Technical Guidelines from long-standing dam safety organizations such as the Canadian Dam Association (CDA), International Commission on Large Dams (ICOLD), and Australian National Committee on Large Dams (ANCOLD), the development of a robust Tailings Management System (TMS) to manage large portfolios of existing structures has presented some challenges for Operators. As the industry moves in the direction of risk-informed approaches to planning, designing, constructing, operating, and closing tailings facilities, Operators need to update their existing management systems and develop specific policies and practices to reflect the step-change presented by the GISTM and facilitate the completion of objectives at a facility level. However, a TMS that is too prescriptive in its implementation of the new guidance may impose artificial restrictions to the process of continual improvement, turning into a mere exercise of “checking boxes.”

Industrias Peñoles and Fresnillo PLC (from here on “The Group”) and their subsidiaries currently own forty (40) tailings storage facilities at their Mexico mining operations, most of which have been in operation for several decades. In 2019, The Group launched a corporate initiative focused on reviewing and improving their tailings governance, engineering, and operational practices, and associated with Knight Piésold in 2021 to develop their TMS. Although not a member of ICMM and MAC, The Group aspires to achieve the best practices and technologies that lead towards alignment with International Standards.

This paper presents the case history of The Group’s TMS first phase of development, which comprises establishing clear, achievable objectives; striving to align with best available/applicable practices and technologies, which will later lead to alignment with recognized International Standards; creating mechanisms to measure compliance with existing and developing Technical Guidelines; and setting a clear roadmap to address gaps that may be identified. The significance of this process cannot be understated in the context of a dynamic industry that is pushing for a culture of change towards zero harm, while also balancing the established technical aspects that govern tailings dam safety.

 

Download the full paper.

Download

Perspectivas recientes

Octubre 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
Septiembre 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
Septiembre 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
Septiembre 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
Agosto 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
Julio 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
Julio 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
Junio 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
Junio 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
Junio 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
Mayo 2024
Knight Piésold: Ensuring African Excellence in the DRC
Mayo 2024
Wild Coast N2 Highway Project Taking Shape
Mayo 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
Abril 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
Abril 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
Abril 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
Abril 2024
Risk and Informed Approach to TSF Design and Operation
Febrero 2024
Empoderamiento y Resiliencia
Enero 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
Enero 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects