The Municipality of Keetmanshoop experienced extensive problems with the capacity of the existing bulk sewer network and constant over-spillage of raw sewage in residential areas, which became a major health concern. The client appointed Knight Piésold to investigate and design a practical and workable solution for this problem.
Knight Piésold’s overall role was to investigate and determine the required capacity to pinpoint the bottlenecks in the existing network and to design a new bulk sewer line to stop over spillage of raw sewer in residential areas.