Challenges with Conducting Tailings Dam Breach Studies

Challenges with Conducting Tailings Dam Breach Studies

Author: Violeta Martin, Ph.D., P.Eng., Daniel Fontaine, P.Eng., and Jaime Cathcart, Ph.D., P.Eng.
Conference: Tailings and Mine Waste 2015
Date: October 25-28, 2015

Engineering practitioners currently use a combination of guidance documents, published papers, and professional experience to support tailings dam breach and inundation studies. There is considerable knowledge and information available in this relatively new field of practice, but standardized and comprehensive guidelines specific to tailings dams are not available.

Practitioners face several key challenges: (a) the more established and mature guidance is typically focused on water storage dams; (b) the available literature may only address specific aspects of dam breach assessment and inundation modelling; (c) the available literature sometimes relies on historical data that may not be consistent with the proposed application; and (d) the results are highly sensitive to the selected modelling inputs.

This paper reflects on the currently available literature on dam breach and inundation studies, compares how the major components for these studies are approached, and discusses how the resulting conclusions may vary.

Key aspects of tailings dam breach and inundation assessment typically considered include: initial conditions and hydrology; boundary conditions; breach parameters; tailings mobility and outflow volume; and flood routing and inundation mapping. This paper quantitatively compares several of the key parameters proposed by various authors and comments on the factors that control their applicability.

 

Download the full technical paper.

Download

Recent Insights

October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
September 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
August 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
July 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
May 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation
February 2024
Empowerment and Resilience
January 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
January 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects