Klamath River Renewal Project

Klamath River Renewal Project

Authors: Craig Nistor1, Scott Rees1, Laura Hazlett2, Olivia Mahony2
Conference: CDA 2025 Annual Conference and Trade Show
Date: September 29 - October 1, 2025

1 Knight Piésold, Vancouver, British Columbia, Canada
2 Klamath River Renewal Corporation, Berkeley, California, USA

ABSTRACT

The Klamath River Renewal Project (KRRP) involved the removal of four hydroelectric facilities on the Klamath River in southern Oregon and northern California, USA, to restore natural flow and volitional fish passage through the dam and reservoir reaches. This is the largest dam removal project to date in the USA. Key environmental and dam safety objectives and constraints for the dam removal works included the following: 1) reservoirs needed to be substantially drawn down (drained) during the winter season prior to dam removal; 2) reservoir drawdown rates needed to address the potential for instability of embankment dam slopes; 3) embankment dams had to be removed during the summer season when the risk of overtopping by flood flows was lowest; and 4) the final cofferdam breach at the largest, most downstream dam had to be engineered and timed to limit the peak discharge rate resulting from the release of water in the lower part of the reservoir. Dam removals were completed by October 2024, in time for the fall salmon run. Salmon were observed to have migrated upstream past the uppermost former dam site within weeks of the dam removal works being completed. Restoration and revegetation activities in the former reservoir reaches are ongoing.

 

Download the full paper.

Download

Recent Insights

November 2026
Characterization of a Tailings Dam Foundation in Dolomitic Rock and Soft Soils and Proposed Treatment with Stone Columns Filled with Cement Grout
November 2026
Comparison of Remeshing and Material Point Method Approaches for Large-Strain Assessment of a Tailings Storage Facility Under Residual Undrained Strength Conditions
November 2026
Shear Strength Assessment of Run‑of‑Mine Waste Rock Used as Support Fill at the Aitik Mine Through Empirical Approaches
November 2026
RTFE Lessons Learned from a TSF Buttressing Project
November 2026
A Framework for Interpreting Variable Penetration Rate CPTu Tests in Mine Tailings
November 2026
GeoStable Tailings Laboratory Mixture Trial
November 2026
Facing a Slithery Dragon: Systematics of the Petracola Ventrimaculata (Boulenger, 1900) Species Complex (Squamata: Gymnophthalmidae) with Description of Five New Species
October 2026
Improving Slope Deformation and Stability Predictions in Anisotropic Rock Masses: A Strain- and Confinement-Dependent Dilation Model for Ubiquitous Joints
October 2026
Integrated Approach to Rapidly Iterate Through LEA Stability Analyses for Design of Staged Construction Over Silty Clay Soils
October 2026
2026 CCE Award of Excellence: Site C Temporary Works
September 2026
Case Study: Paste Tailings Transport Optimization, Model Calibration and Concentration Sensitivity
September 2026
Multiple Account Analysis of Tailings Technologies to Define the Next TSF Stages
September 2026
Climate Change Considerations in Mine Water Management and Engineering Design for Reclamation Planning
August 2026
Beyond the Design Storm: From Compliance Metrics to Adaptive Operations for Consecutive Minor Events in Dams
August 2026
Knight Piésold: Engineering Namibia's Future
July 2026
Knight Piésold: Driving Integrated Water Management for Mining's Future
July 2026
Stochastic Hydrology Reveals the Controls of Forest Harvesting - Peakflow Causal Relations in Snow-Transient Environment
June 2026
From Liability to Asset: A Sustainable Approach for Mine Tailings Remediation in Peru
June 2026
Unsaturated Shear Strength Characteristics of Filtered Tailings through Modified Direct Simple Shear (MDSS) Apparatus
May 2026
Building Resilient Mines: Knight Piésold's Multidisciplinary Engineering Expertise