Dam-break: Effect of Water Content in Tailings vs Run-out Distance

Dam-break: Effect of Water Content in Tailings vs Run-out Distance

Author: Diego Inzunza, Jorge León
Conference: Tailings 2019
Date: July 10-12, 2019

ABSTRACT
In current regulatory frameworks, dam breach and tailings run-out modelling of tailing storage facilities is a requirement and a matter of increasing interest within the regulatory agencies and practitioners. Increased levels of densification of impounded tailing materials by means of alternative tailing deposition technologies, by means of installation of wick drains, or by loading the surface of the impoundment with waste rock, all generate a change in the interstitial pressure of the tailing column that may lead to densification and an increase of the rheology of the settled tailings. In the case of run-out analyses, we present a sensitivity analysis of the effect of the degree of consolidation at the time of a dam breach on the run-out distance potential. The results show a decrease of up to 16% in the maximum area reached by the outflow due to the increase in the degree of consolidation. The incorporation of the relative effect of densification methods and the resulting change in rheology represents a progress in understanding the critical elements that drive the potential for downstream impact of a dam breach event.

 

Download the full technical paper.

Download

Recent Insights

October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
September 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
August 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
July 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
May 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation
February 2024
Empowerment and Resilience
January 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
January 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects