Evaluating the Effectiveness of Sunnyside Gold Corporation's Reclamation, San Juan County, Colorado, USA

Evaluating the Effectiveness of Sunnyside Gold Corporation's Reclamation, San Juan County, Colorado, USA

Author: Steven Lange
Conference: Mine Closure 2019
Date: September 3-6, 2019

ABSTRACT
The Animas River in the area around Silverton, San Juan County, Colorado has been adversely impacted by high loading of iron, aluminium, cadmium, copper, lead, zinc, arsenic, and nickel. Metals loading in the Animas River has limited aquatic life, including the trout fishery downstream from Silverton. The metals concentrations in the Animas River is due to acid rock drainage formed from a combination of natural weathering of mineralised rocks and residues from over 100 years of historic mining. Sunnyside Gold Corporation (SGC) was formed and acquired the Sunnyside Mine in the Upper Animas basin in 1985. SGC operated the mine from 1986 until 1991 using modern techniques and under strict environmental regulation, and has engaged in more than 30 years of reclamation and remediation in the Silverton Caldera. This included removal of mine waste from owned and other area mines, treatment of water discharged from mine portals, seasonal treatment of the flow in Cement Creek, installation of bulkheads in mine workings, and stabilisation of tailings deposits. Evaluation of long-term monitoring results demonstrates that SGC’s actions have substantially reduced acid rock drainage and metals loading in the Animas River compared to what would have otherwise been the case.

 

Download the full technical paper.

Download

 

Recent Insights

July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation
February 2024
Empowerment and Resilience
January 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
January 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects
November 2023
Knight Piésold Commences with the ESIA for Haib Copper
November 2023
Insights from the Compilation and Critical Assessment of Breach and Runout Characteristics from Historical Tailings Dam Failures: Implications for Numerical Modelling
November 2023
Earthquake-induced Deformation Analysis of a TSF Undergoing Tailings Reprocessing
November 2023
Case Study: Approach to Determining the Risk Mitigation Priority of a Historic TSF in North America
October 2023
Data Management and Insights for Effective Tailings Storage Facility Management
October 2023
The Role of Sensitivity Analysis in Selecting Dam Breach Parameters
October 2023
Influence of Increased Confining Stress on Undrained Behavior of Tailings: A Case History at the Candelaria Mine