Evaluating the Effectiveness of Sunnyside Gold Corporation's Reclamation, San Juan County, Colorado, USA

Evaluating the Effectiveness of Sunnyside Gold Corporation's Reclamation, San Juan County, Colorado, USA

Author: Steven Lange
Conference: Mine Closure 2019
Date: September 3-6, 2019

ABSTRACT
The Animas River in the area around Silverton, San Juan County, Colorado has been adversely impacted by high loading of iron, aluminium, cadmium, copper, lead, zinc, arsenic, and nickel. Metals loading in the Animas River has limited aquatic life, including the trout fishery downstream from Silverton. The metals concentrations in the Animas River is due to acid rock drainage formed from a combination of natural weathering of mineralised rocks and residues from over 100 years of historic mining. Sunnyside Gold Corporation (SGC) was formed and acquired the Sunnyside Mine in the Upper Animas basin in 1985. SGC operated the mine from 1986 until 1991 using modern techniques and under strict environmental regulation, and has engaged in more than 30 years of reclamation and remediation in the Silverton Caldera. This included removal of mine waste from owned and other area mines, treatment of water discharged from mine portals, seasonal treatment of the flow in Cement Creek, installation of bulkheads in mine workings, and stabilisation of tailings deposits. Evaluation of long-term monitoring results demonstrates that SGC’s actions have substantially reduced acid rock drainage and metals loading in the Animas River compared to what would have otherwise been the case.

 

Download the full technical paper.

Download

 

Recent Insights

May 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
February 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
February 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
November 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
November 2022
Evaluation of Tailings Behaviour for Dam Breach Assessments
November 2022
Tailings Improvement by Stress-Densification from Waste Rock Capping
November 2022
Transforming Tailings Management Systems toward Alignment with the GISTM: A Case History
October 2022
Managing Excessive Pit Wall Deformation of Weak Rock Mass
October 2022
State-of-the-art Method for Estimating Long-term Hydroclimatic Conditions for Tailing Dam Water Management and Dam Safety Planning
August 2022
Observed Subsidence Progression at New Afton Mine in Response to Lift 1 Mining
June 2022
Hydrometric Monitoring and Effluent Discharge Mixing in Challenging Natural Conditions
May 2022
Inundation Modelling of Non-Newtonian Tailings Dam Breach Outflows
May 2022
Video: Tailings Management Compliancy Picks Up Momentum
May 2022
A Catch up with...Richard Elmer
February 2022
Engineer of Record Services for Tailings Facilities
November 2021
Knight Piésold's Projects Commended at Prestigious Awards
November 2021
Advances in Ensuring Tailings Dam Safety
November 2021
Gearing Up for Growth in Zambia
October 2021
Climate Change Effects on Rainfall Extremes and Implications for Highway Drainage Structures
October 2021
Knight Piésold, aliado de la minería sustentable