The Construction Supervision of Your First Category III Dam - Aspects All Young Engineers Should Know - The Neckartal Dam, Namibia

The Construction Supervision of Your First Category III Dam - Aspects All Young Engineers Should Know - The Neckartal Dam, Namibia

Author: GL Coetzee
Conference: SANCOLD Conference 2017
Date: November 15-17, 2017

ABSTRACT
Young engineers are well equipped with knowledge regarding the design, engineering, and construction of Category III dams, but require in-field experience to develop both their project and program management skills for such an undertaking. The figures and statistics of these large scale projects can be overwhelming and it can often take months for young engineers to find their feet during the construction phase of such a project. Upon completion, the Neckartal Dam will be the largest dam in Namibia, with nearly three times the volume of the Hardap Dam, currently the largest reservoir in the country. The multi-billion Namibian Dollar, Category III Neckartal dam will contribute significantly to the sustainable economic development of the //Kharas Region, southern Namibia. The dam will provide water for crop cultivation covering approximately 5 000 hectares of irrigated farmland and provide employment for several hundred people in the process. For the author (a young engineer), it was a dream come true to be part of the construction of such a monumental structure. Projects of this magnitude may influence the direction of one’s career, cause lifestyle changes and challenge the perspective and vision of an engineer’s life. This paper shares lessons learned in overcoming project and individual challenges faced by a young engineer and provides a message to supervisors as to what may be expected from the younger generation.

 

Download the full technical paper.

Download

 

Recent Insights

May 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
February 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
February 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
November 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
November 2022
Evaluation of Tailings Behaviour for Dam Breach Assessments
November 2022
Tailings Improvement by Stress-Densification from Waste Rock Capping
November 2022
Transforming Tailings Management Systems toward Alignment with the GISTM: A Case History
October 2022
Managing Excessive Pit Wall Deformation of Weak Rock Mass
October 2022
State-of-the-art Method for Estimating Long-term Hydroclimatic Conditions for Tailing Dam Water Management and Dam Safety Planning
August 2022
Observed Subsidence Progression at New Afton Mine in Response to Lift 1 Mining
June 2022
Hydrometric Monitoring and Effluent Discharge Mixing in Challenging Natural Conditions
May 2022
Inundation Modelling of Non-Newtonian Tailings Dam Breach Outflows
May 2022
Video: Tailings Management Compliancy Picks Up Momentum
May 2022
A Catch up with...Richard Elmer
February 2022
Engineer of Record Services for Tailings Facilities
November 2021
Knight Piésold's Projects Commended at Prestigious Awards
November 2021
Advances in Ensuring Tailings Dam Safety
November 2021
Gearing Up for Growth in Zambia
October 2021
Climate Change Effects on Rainfall Extremes and Implications for Highway Drainage Structures
October 2021
Knight Piésold, aliado de la minería sustentable