Proper design of a heap leach facility requires the development of a leach ore loading plan that can accommodate its ultimate capacity. The loading plan and associated capacity assessments will be more representative of actual field performance if they consider the variation in leach ore dry unit weight over time as the heap is loaded and the leach ore compresses under self-weight. That can be accomplished by careful evaluation of results from laboratory testing of representative samples of the leach ore.

Rigid wall permeability testing provides data about dry unit weight (and hence void ratio), saturated hydraulic conductivity, and vertical effective confining stress. These data can be fitted to relationships for compressibility (void ratio as a function of effective confining stress) and conductivity (saturated hydraulic conductivity as a function of void ratio) that were originally developed for self-weight consolidation of soft, fine-grained soils, e.g., tailings. The forms of those equations also typically fit laboratory test data from coarse-grained leach ore.

Once the compressibility and conductivity relationships are defined, incremental stress calculations with a spreadsheet allow for the development of: (1) profiles of dry unit weight and saturated hydraulic conductivity with depth in a unit area column of leach ore; and (2) the variation in depth-weighted average dry unit weight with average heap height. The average dry unit weight relationship may then be incorporated into heap loading plans and capacity assessments. Comparison of the planned leach application rate to the anticipated saturated hydraulic conductivity of the leach ore under the maximum heap height, assuming vertical percolation under unit hydraulic gradient, also provides a preliminary assessment of hydraulic performance.

Results for two case studies, including both a crushed and agglomerated copper heap and a run-of-mine gold heap, are presented. Actual results from mine production records compare well with predictions, although assessment of the run-of-mine gold heap required additional refinement to adjust for the effects of oversize material that could not be incorporated into the laboratory-scale testing.

 

Download the full technical paper.

Download

Recent Insights

May 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
February 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
February 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
November 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
November 2022
Evaluation of Tailings Behaviour for Dam Breach Assessments
November 2022
Tailings Improvement by Stress-Densification from Waste Rock Capping
November 2022
Transforming Tailings Management Systems toward Alignment with the GISTM: A Case History
October 2022
Managing Excessive Pit Wall Deformation of Weak Rock Mass
October 2022
State-of-the-art Method for Estimating Long-term Hydroclimatic Conditions for Tailing Dam Water Management and Dam Safety Planning
August 2022
Observed Subsidence Progression at New Afton Mine in Response to Lift 1 Mining
June 2022
Hydrometric Monitoring and Effluent Discharge Mixing in Challenging Natural Conditions
May 2022
Inundation Modelling of Non-Newtonian Tailings Dam Breach Outflows
May 2022
Video: Tailings Management Compliancy Picks Up Momentum
May 2022
A Catch up with...Richard Elmer
February 2022
Engineer of Record Services for Tailings Facilities
November 2021
Knight Piésold's Projects Commended at Prestigious Awards
November 2021
Advances in Ensuring Tailings Dam Safety
November 2021
Gearing Up for Growth in Zambia
October 2021
Climate Change Effects on Rainfall Extremes and Implications for Highway Drainage Structures
October 2021
Knight Piésold, aliado de la minería sustentable