Challenges in Classifying and Designing Spillway Upgrades for a Small Embankment Dam Upstream of an Urban Population

Challenges in Classifying and Designing Spillway Upgrades for a Small Embankment Dam Upstream of an Urban Population

Author: Katrina Wechselberger, Violeta Martin, Egbert Scherman, Alana Shewan
Conference: CDA 2018 Annual Conference
Date: October 13-18, 2018

ABSTRACT
A 10 m high embankment dam located 4 km upstream of a populated area was assessed during its Dam Safety Review as requiring an upgrade to the spillway capacity to comply the current CDA Dam Safety Guidelines and BC Dam Safety Regulations. At normal operating levels, the Dam stores approximately 31,000 m3 of water. The Dam was completed in 1966 and has been successfully operated by the Dam Owner without incident for over 50 years as a critical part of the water distribution system, specifically the diversion and intake location for the irrigation system serving the area’s rural community. Various studies were completed on the Dam to assess its compliance and classification under the new criteria.

Due to the confined valley and orientation of the spillway weir, the only feasible solution to continue the existing operation without decommissioning and replacement, was to raise the crest of the Dam in order to pass the new design flood through the existing spillway. Given the downstream permanent population, the inundation study showed areas of residential and commercial properties affected. A detailed study translating inundated areas into an estimated loss of life and economic losses followed. A discussion of the risk mitigation efforts and emergency planning that is possible with a forecasted flood induced event led to a solution that satisfied both the consequence criteria of the CDA Dam Safety Guidelines, the BC Dam Safety Regulations and the engineering design limitations for this small dam and reservoir volume.

 

Download the full technical paper.

Download

Recent Insights

November 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
November 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
November 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
September 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
August 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
July 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
May 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation