ABSTRACT
A 10 m high embankment dam located 4 km upstream of a populated area was assessed during its Dam Safety Review as requiring an upgrade to the spillway capacity to comply the current CDA Dam Safety Guidelines and BC Dam Safety Regulations. At normal operating levels, the Dam stores approximately 31,000 m3 of water. The Dam was completed in 1966 and has been successfully operated by the Dam Owner without incident for over 50 years as a critical part of the water distribution system, specifically the diversion and intake location for the irrigation system serving the area’s rural community. Various studies were completed on the Dam to assess its compliance and classification under the new criteria.

Due to the confined valley and orientation of the spillway weir, the only feasible solution to continue the existing operation without decommissioning and replacement, was to raise the crest of the Dam in order to pass the new design flood through the existing spillway. Given the downstream permanent population, the inundation study showed areas of residential and commercial properties affected. A detailed study translating inundated areas into an estimated loss of life and economic losses followed. A discussion of the risk mitigation efforts and emergency planning that is possible with a forecasted flood induced event led to a solution that satisfied both the consequence criteria of the CDA Dam Safety Guidelines, the BC Dam Safety Regulations and the engineering design limitations for this small dam and reservoir volume.

 

Download the full technical paper.

Download

Recent Insights

July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation
February 2024
Empowerment and Resilience
January 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
January 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects
November 2023
Knight Piésold Commences with the ESIA for Haib Copper
November 2023
Insights from the Compilation and Critical Assessment of Breach and Runout Characteristics from Historical Tailings Dam Failures: Implications for Numerical Modelling
November 2023
Earthquake-induced Deformation Analysis of a TSF Undergoing Tailings Reprocessing
November 2023
Case Study: Approach to Determining the Risk Mitigation Priority of a Historic TSF in North America
October 2023
Data Management and Insights for Effective Tailings Storage Facility Management
October 2023
The Role of Sensitivity Analysis in Selecting Dam Breach Parameters
October 2023
Influence of Increased Confining Stress on Undrained Behavior of Tailings: A Case History at the Candelaria Mine