Challenges in Classifying and Designing Spillway Upgrades for a Small Embankment Dam Upstream of an Urban Population

Challenges in Classifying and Designing Spillway Upgrades for a Small Embankment Dam Upstream of an Urban Population

Author: Katrina Wechselberger, Violeta Martin, Egbert Scherman, Alana Shewan
Conference: CDA 2018 Annual Conference
Date: October 13-18, 2018

ABSTRACT
A 10 m high embankment dam located 4 km upstream of a populated area was assessed during its Dam Safety Review as requiring an upgrade to the spillway capacity to comply the current CDA Dam Safety Guidelines and BC Dam Safety Regulations. At normal operating levels, the Dam stores approximately 31,000 m3 of water. The Dam was completed in 1966 and has been successfully operated by the Dam Owner without incident for over 50 years as a critical part of the water distribution system, specifically the diversion and intake location for the irrigation system serving the area’s rural community. Various studies were completed on the Dam to assess its compliance and classification under the new criteria.

Due to the confined valley and orientation of the spillway weir, the only feasible solution to continue the existing operation without decommissioning and replacement, was to raise the crest of the Dam in order to pass the new design flood through the existing spillway. Given the downstream permanent population, the inundation study showed areas of residential and commercial properties affected. A detailed study translating inundated areas into an estimated loss of life and economic losses followed. A discussion of the risk mitigation efforts and emergency planning that is possible with a forecasted flood induced event led to a solution that satisfied both the consequence criteria of the CDA Dam Safety Guidelines, the BC Dam Safety Regulations and the engineering design limitations for this small dam and reservoir volume.

 

Download the full technical paper.

Download

Recent Insights

May 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
February 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
February 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
November 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
November 2022
Evaluation of Tailings Behaviour for Dam Breach Assessments
November 2022
Tailings Improvement by Stress-Densification from Waste Rock Capping
November 2022
Transforming Tailings Management Systems toward Alignment with the GISTM: A Case History
October 2022
Managing Excessive Pit Wall Deformation of Weak Rock Mass
October 2022
State-of-the-art Method for Estimating Long-term Hydroclimatic Conditions for Tailing Dam Water Management and Dam Safety Planning
August 2022
Observed Subsidence Progression at New Afton Mine in Response to Lift 1 Mining
June 2022
Hydrometric Monitoring and Effluent Discharge Mixing in Challenging Natural Conditions
May 2022
Inundation Modelling of Non-Newtonian Tailings Dam Breach Outflows
May 2022
Video: Tailings Management Compliancy Picks Up Momentum
May 2022
A Catch up with...Richard Elmer
February 2022
Engineer of Record Services for Tailings Facilities
November 2021
Knight Piésold's Projects Commended at Prestigious Awards
November 2021
Advances in Ensuring Tailings Dam Safety
November 2021
Gearing Up for Growth in Zambia
October 2021
Climate Change Effects on Rainfall Extremes and Implications for Highway Drainage Structures
October 2021
Knight Piésold, aliado de la minería sustentable