Design Considerations for the Capilano Energy Recovery Facility and Break Head Tank

Design Considerations for the Capilano Energy Recovery Facility and Break Head Tank

Author: Rob Adams
Conference: HydroVision 2017
Date: June 27-30, 2017

INTRODUCTION
Metro Vancouver (MV) is a public works organization that serves 18 municipalities (over 2 million people) in the greater Vancouver region of British Columbia, Canada. Amongst numerous other functions including waste collection and disposal, one of its primary tasks is to reliably provide clean, potable drinking water (over 1.1 million m3 per day average) to the residents of the cities served through a system of reservoirs, treatment facilities, pump stations and piping networks.

Most of Vancouver’s drinking water supply comes from watersheds in the mountains on the north side of the city (North Vancouver). Three main watersheds collect fresh water in three primary reservoirs. The reservoirs are protected and the water supply has historically been clean, with little need for elaborate treatment facilities. However, issues with turbidity, though not directly affecting potability, led in the 1990’s to the planning of a Filtration Plant to serve the Capilano and Seymour reservoirs (Seymour-Capilano Filtration Project, SCFP).

 

Download the full technical paper.

Download

Recent Insights

October 2025
2025 CCE Awards Showcase: Salton Sea Species Conservation Habitat Project
September 2025
Klamath River Renewal Project - Dam Breach Analysis Used for Designing the Final Breach of the Iron Gate Dam
September 2025
Klamath River Renewal Project - Optimization of the Iron Gate Dam Historic Diversion Tunnel Using CFD Analysis to Support Reservoir Drawdown
September 2025
Klamath River Renewal Project - Design of Dam Modification for Reservoir Drawdown, River Diversion and Dam Removal of the Copco No. 1 Dam
September 2025
Drawdown Modelling of Four Reservoirs on the Klamath River to Support Hydroelectric Facility Decommissioning
September 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
September 2025
Lessons Learned in the Interpretation of SCPT on a Tailings Facility Using the CSSM Framework
September 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
September 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
September 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
August 2025
The Evolution of Structural Domains from Scoping Study to Operations for the Meadowbank Mine – Amaruq Site
August 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
July 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
July 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
June 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
June 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
June 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
May 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
April 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
November 2024
Knight Piésold: Commitment to African Excellence