Experience Counts

Experience Counts

Publication: Ekurhuleni Transport
Author: Wayne Hunt
Date: 2016

Ninety-five-year -old Knight Piésold is a Level 2 BBBEE company that places emphasis on staff training, which has helped it to secure several lucrative tenders.

Knight Piésold has been involved with numerous large-scale projects, many of which have been for the South African Roads Agency Limited (Sanral). In fact, Sanral projects account for about 70% of the work the company has done. With a focus predominantly in the northern parts of the country, the company has completed several projects for the provincial governments of Mpumalanga, Gauteng and Limpopo.

In terms of municipal infrastructure, Knight Piésold has also been responsible for the upgrading of the Rosherville Road in City Deep, which is an important part of the city’s inland port, as it accommodates large volumes of heavy trucks.

Knight Piésold was tasked with widening the 1.6 km road, which is owned by the Johannesburg Roads Agency (JRA). Sanral, however, was appointed as the implementing agent and brought in to carry out the project. Work on the road involved in situ recycling of the existing road to a depth of 180 mm, placing a bitumentreated base over it and incorporating a 45 mm asphalt wearing course. Rosherville Road’s lighting had to be moved and service relocations had to be performed. Full access management was also provided at the properties.

 

Download the full article.

Download

Recent Insights

September 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
September 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
September 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
September 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
August 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
July 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
July 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
June 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
June 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
June 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
May 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
April 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
November 2024
Knight Piésold: Commitment to African Excellence
November 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
November 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
November 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Grouting to Reduce Seepage at Neckartal Dam, Namibia
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality