Investigation of Sediment Transport Through a Run-of-River Hydroelectric Project

Investigation of Sediment Transport Through a Run-of-River Hydroelectric Project

Author: Violeta Martin, Michael Pullinger, Alana Shewan, Nathan Smith
Conference: HydroVision International 2014
Date: July 22-25, 2014

A 25 MW run-of-river hydroelectric project is proposed in coastal British Columbia, Canada. Baseline studies identified that the bedload sediment transport rate in the project area is relatively low, and consequently, interruption of bed material replenishment in the reaches downstream of the intake represents an environmental concern.

A prerequisite for the successful design of the proposed project includes passing of the spawning size gravel through the intake facility during the period of headpond sediment infilling. A sluice gate has been incorporated in the intake structure to enable the sluicing of sediment. Numerical modelling was undertaken to aid with the intake design and to determine the sediment transport efficiency through the headpond. Hydrodynamic modelling techniques (1D, 2D and CFD) were combined to assess the proposed design and provide an overview of water depths, velocities and bed shear stresses along with the potential for gravel mobility through the headpond reach both before and after the construction of the intake.

 

Download the full technical paper.

Download

Recent Insights

September 2025
Laying Groundwork for Future Mining: Infrastructure Support by Knight Piésold
September 2025
Challenges of Tailings Transport Pumping Systems in Negative Static Head Applications
September 2025
Hydraulic Evaluation of Tailings Transport Systems in Mountainous Terrain: Density Wave Analysis
September 2025
The Role of Rheology Tests in the Design and Operation of Long-Distance Slurry Transport Systems
August 2025
Safe Dams, Straight Talk: The Knight Piésold Difference
July 2025
Knight Piésold Zambia: Building a Future of Engineering Brilliance and Local Empowerment
July 2025
Water Engineering for Modern Mining: Bridging Mining with Sustainability
June 2025
The Essence of Material Compatibility in Advanced Barrier Systems of Existing TSFs
June 2025
Inverted Barriers in Tailings Storage Facilities: Lessons Learnt
June 2025
Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach
May 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
April 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
November 2024
Knight Piésold: Commitment to African Excellence
November 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
November 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
November 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Grouting to Reduce Seepage at Neckartal Dam, Namibia
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality