Presenting a Case for Two Closure Approaches

Presenting a Case for Two Closure Approaches

Author: Richard J Frechette
Conference: 1st International Congress on Planning for Closure of Mining Operations
Date: November 20-22, 2016

ABSTRACT
This articles makes a case for two closures approaches: (1) a plan developed pre-mining; or (2) a plan developed during late operations or post?mining. A pre-mining closure plan that dovetails with a tailored operating plan can achieve goals with modest and low-volatility post-mining capital expenditure. A post-mining closure plan can capitalize on practical yet innovative techniques to yield best-achievable results with the resources available.

Either case has its place for consideration depending upon where on the timeline the mine owner has taken possession of the property. In the first case, the closure obligation can be closely managed during operations by careful execution of a holistic plan that integrates purposeful operating activities to advance closure efforts and reduce associated costs incurred post?operations. It can be demonstrated that any closure plan can be implemented at lower cost if operations are modified to cater to specific, even if limited, aspects of the closure plan. In the second case, practical objectives can be developed and achieved with a realistic understanding of techniques and activities that can be successfully executed under the circumstances that exist at actual mine closure. One of the keys to success if following this second approach is to employ a skilled and experienced practitioner of closure planning.

The situations that lead to the circumstances where each case is applicable and the general thought process that may be employed are explained in this article. Some practical examples of closure elements to consider and how they can be used to bolster the argument for each case are provided to equip the reader with concrete illustrations.

 

Download the full technical paper.

Download

Recent Insights

October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
September 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
August 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
July 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC
May 2024
Wild Coast N2 Highway Project Taking Shape
May 2024
Interview: Guillermo Barreda, Gerente General, Knight Piésold Perú
April 2024
Risk Mitigation through Design Optimization Utilizing Seasonal Effects under Arctic Conditions at the Amaruq Mine
April 2024
Synthetic Rock Mass Modeling of Progressive Unravelling and Overall Slope Stability Using the Discrete Element Method
April 2024
Operational Slope Stability Risk Management for Large Open Pits at the Mount Milligan Mine – A Case Study
April 2024
Risk and Informed Approach to TSF Design and Operation
February 2024
Empowerment and Resilience
January 2024
Balancing Act: Water Usage Management Vital for a Sustainable Future
January 2024
A Difficult Balance Between Engineering, Environmental, Social and Economic Aspects