Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach

Prioritizing the Mitigation of Legacy Geomechanical Mine Hazards Using a Risk-Based Approach

Authors: Weir, R.D. and Peacock, B.D.1, Wilson Muir2
Conference: 59th U.S. Rock Mechanics / Geomechanics Symposium
Date: June 8-11, 2025

1 Knight Piésold Ltd., North Bay, Ontario, Canada

ABSTRACT

Mining companies and governments are managing an increasing number of legacy assets in various states of closure, and these assets often include potential geomechanical hazards such as crown pillars, slopes, raises, and portals. Mitigating these hazards may require significant time and resources, and it may not be practical or economical to implement rehabilitation measures for all of the identified hazards in the short-term. This paper outlines a method for identifying and prioritizing hazards using a risk-based approach. The approach has been used successfully at numerous mine sites across North America and includes compiling the available data, identifying potential hazards, ground truthing and verifying expectations, assessing the likelihoods and consequences of failures, assigning risk ratings, and evaluating mitigation and rehabilitation measures.

 

Download the full paper.

Download

Recent Insights

May 2025
Knight Piésold: Sustainable Projects in DRC Through Baseline Studies
April 2025
Advancements in Geotechnical Investigations for the Characterisation of Upstream Tailings Dams in SA
November 2024
Design of a Co-disposal Facility for Thickened Tailings and Potentially Acid-generating Waste Rock
November 2024
Compaction Sensitivity in Tailings Stack Infiltration Modeling: Unsaturated Properties Uncertainty Analysis
November 2024
Volumes of Dam Material Mobilized by Erosion During Tailings Dam Failure Events
October 2024
Estudio de rotura de una presa de jales en la zona centro-norte de México
September 2024
Grouting to Reduce Seepage at Neckartal Dam, Namibia
September 2024
Influence of Pre-Existing Mobilized Zones on B3 Cave Propagation and Initial Subsidence at the New Afton Mine
September 2024
Importance of Indigenous Community Engagement related to ARD/ML and Long-Term Water Quality
September 2024
Effective Assessment of ARD/ML Potential for Non-Mining Infrastructure Projects
August 2024
CESA Aon Engineering Excellence Awards 2024: Kikagati Hydropower Plant
July 2024
Interview: Mario Lazo Emparanza, Regional Manager, Knight Piésold Chile
July 2024
A Diverse Approach in Geosynthetic Barrier Systems to Ensure Environmental Compliance of Existing TSFs
July 2024
Case History: Application Of Geosynthetics in A Tailings Storage Facility Rockfill Buttress Construction Project
July 2024
Visionary Leadership: Driving Engineering Excellence in Africa with Vishal Haripersad
June 2024
Concept Feasibility and Predicted Behavior of Mining a Rock Tower with Drill-and-Blast Undermining Using Dynamic Three-Dimensional Discontinuum Numerical Models
June 2024
Estimating Shear Stress within a Clay Foundation Using the Burgers-Creep Model
June 2024
Laboratory Study of Manganese Mining Overburden Mixed with Lime as a Paving Subbase Layer
May 2024
Knight Piésold: Ensuring African Excellence in the DRC