Remediation Helps Rescue a River

Remediation Helps Rescue a River

Publication: Engineering & Mining Journal
Author: Steven Lange
Date: July 2018

Metals loading adversely impacts the Animas River in the area around Silverton, San Juan County, Colorado. The metals of concern include iron, aluminum, cadmium, copper, lead, zinc, arsenic and nickel. The metals loading in the Animas River is due to acid rock drainage that is created when sulphide minerals are exposed to air and water to produce sulphuric acid. The acidic water can dissolve area minerals and then deposit metals in rivers like the Animas. Metals loading in the Animas River has limited aquatic life, including the trout fishery downstream from Silverton.

Sunnyside Gold Corp. (SGC) was formed and acquired the Sunnyside mine in 1985 and mined it from 1986 until 1991 under modern environmental regulations and using modern mining techniques. Since 1985, SGC has engaged in more than 30 years of reclamation and remediation in the Silverton Caldera. This article analyzes the geologic setting and historic mining that have caused the metals loading in the Animas River as well as the effect of SGC’s mining and extensive reclamation activities. It is also details how the remediation actions that SGC has taken have substantially reduced acid rock drainage and metals loading in the Animas River.

 

Download the full article.

Download

Recent Insights

May 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
February 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
February 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
November 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
November 2022
Evaluation of Tailings Behaviour for Dam Breach Assessments
November 2022
Tailings Improvement by Stress-Densification from Waste Rock Capping
November 2022
Transforming Tailings Management Systems toward Alignment with the GISTM: A Case History
October 2022
Managing Excessive Pit Wall Deformation of Weak Rock Mass
October 2022
State-of-the-art Method for Estimating Long-term Hydroclimatic Conditions for Tailing Dam Water Management and Dam Safety Planning
August 2022
Observed Subsidence Progression at New Afton Mine in Response to Lift 1 Mining
June 2022
Hydrometric Monitoring and Effluent Discharge Mixing in Challenging Natural Conditions
May 2022
Inundation Modelling of Non-Newtonian Tailings Dam Breach Outflows
May 2022
Video: Tailings Management Compliancy Picks Up Momentum
May 2022
A Catch up with...Richard Elmer
February 2022
Engineer of Record Services for Tailings Facilities
November 2021
Knight Piésold's Projects Commended at Prestigious Awards
November 2021
Advances in Ensuring Tailings Dam Safety
November 2021
Gearing Up for Growth in Zambia
October 2021
Climate Change Effects on Rainfall Extremes and Implications for Highway Drainage Structures
October 2021
Knight Piésold, aliado de la minería sustentable