Seismic and Structural Stability Analysis for Increased Ground Motions at the Corra Linn Dam in British Columbia, Canada

Seismic and Structural Stability Analysis for Increased Ground Motions at the Corra Linn Dam in British Columbia, Canada

Author: Katrina T. Wechselberger, Egbert J. Scherman
Conference: CDA Annual Conference
Date: October 15-20, 2016

ABSTRACT
Canada’s extensive and aging dam infrastructure in combination with the updated and revised Dam Safety Regulations often require re?examining previously satisfactory analysis and developing a greater understanding of the cumulative and independent effects of a series of common design assumptions. Knight Piésold Ltd. recently completed a seismic and structural stability analysis on the Corra Linn Dam and Spillway located on the Kootenay River, approximately 15 km downstream of the city of Nelson, British Columbia.

Originally constructed in 1932, the dam and hydroelectric facility underwent repairs and upgrades as recent as 1990. The work consisted primarily of concrete re?surfacing, the installation of post?tensioned rock anchors to add the dam’s stability, and the installation of piezometers to measure seepage under the dam and into the rock foundation. It was recommended in the latest Dam Safety Review (DSR) that the seismic stability of the dam structures be reassessed with the larger design earthquake values, in this case the Maximum Credible Earthquake (MCE).

Two separate 3D Finite Element Analysis (FEA) software programs were used to complete the analysis: Strand7 Software and ANSYS Simulation Software. This allowed for some confirmation of the results between programs and users. Pseudo?Static and Spectral Response analyses were performed. The various unknown factors such as actual material strengths, cracked structure/rock interface, etc. commonly encountered in a structure of advanced age can easily lead to compounded conservative assumptions. Where potential weaknesses are found it is important to understand what has contributed most significantly to the results so that recommendations can be well informed and clearly identify where further investigation is warranted.

 

Download the full technical paper.

Download

Recent Insights

May 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
February 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
February 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
November 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
November 2022
Evaluation of Tailings Behaviour for Dam Breach Assessments
November 2022
Tailings Improvement by Stress-Densification from Waste Rock Capping
November 2022
Transforming Tailings Management Systems toward Alignment with the GISTM: A Case History
October 2022
Managing Excessive Pit Wall Deformation of Weak Rock Mass
October 2022
State-of-the-art Method for Estimating Long-term Hydroclimatic Conditions for Tailing Dam Water Management and Dam Safety Planning
August 2022
Observed Subsidence Progression at New Afton Mine in Response to Lift 1 Mining
June 2022
Hydrometric Monitoring and Effluent Discharge Mixing in Challenging Natural Conditions
May 2022
Inundation Modelling of Non-Newtonian Tailings Dam Breach Outflows
May 2022
Video: Tailings Management Compliancy Picks Up Momentum
May 2022
A Catch up with...Richard Elmer
February 2022
Engineer of Record Services for Tailings Facilities
November 2021
Knight Piésold's Projects Commended at Prestigious Awards
November 2021
Advances in Ensuring Tailings Dam Safety
November 2021
Gearing Up for Growth in Zambia
October 2021
Climate Change Effects on Rainfall Extremes and Implications for Highway Drainage Structures
October 2021
Knight Piésold, aliado de la minería sustentable