Site C Hydroelectric Project: Predicted Changes in Peace River Morphology and Sediment Transport

Site C Hydroelectric Project: Predicted Changes in Peace River Morphology and Sediment Transport

Author: Craig Nistor, Violeta Martin
Conference: ICOLD 2017 Annual Meeting
Date: July 3-7, 2017

ABSTRACT
The 1100 MW Site C Hydroelectric Project involves the construction of a large dam on the Peace River in British Columbia, Canada. The Environmental Impact Statement (EIS) for the project considered technical, socio-economic and environmental aspects and described the predicted effects in the context of previous hydroelectric development and future climate change. Studies were based on long-term field observations and comprehensive modeling. The geomorphology and sediment transport study completed for the EIS predicted changes in channel morphology and suspended sediment loading during construction and operations, which could have ramifications for domestic and industrial water users and aquatic resources. Suspended sediment and turbidity gauging were used to characterize baseline conditions in the Peace River and its key tributaries. A three-dimensional hydrodynamic model was used to simulate suspended sediment dynamics and deposition within the Site C reservoir. During operations the reservoir will trap most of the incoming sediment, with the initial reservoir volume predicted to be reduced by 2.5% after 50 years. The corresponding reduction in mean annual suspended sediment load is predicted to be 54% immediately downstream of the reservoir, but only 2% 300 km downstream at the Town of Peace River, Alberta, because of large sediment inputs from tributaries.

 

Download the full technical paper.

Download

Recent Insights

May 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
February 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
February 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
November 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
November 2022
Evaluation of Tailings Behaviour for Dam Breach Assessments
November 2022
Tailings Improvement by Stress-Densification from Waste Rock Capping
November 2022
Transforming Tailings Management Systems toward Alignment with the GISTM: A Case History
October 2022
Managing Excessive Pit Wall Deformation of Weak Rock Mass
October 2022
State-of-the-art Method for Estimating Long-term Hydroclimatic Conditions for Tailing Dam Water Management and Dam Safety Planning
August 2022
Observed Subsidence Progression at New Afton Mine in Response to Lift 1 Mining
June 2022
Hydrometric Monitoring and Effluent Discharge Mixing in Challenging Natural Conditions
May 2022
Inundation Modelling of Non-Newtonian Tailings Dam Breach Outflows
May 2022
Video: Tailings Management Compliancy Picks Up Momentum
May 2022
A Catch up with...Richard Elmer
February 2022
Engineer of Record Services for Tailings Facilities
November 2021
Knight Piésold's Projects Commended at Prestigious Awards
November 2021
Advances in Ensuring Tailings Dam Safety
November 2021
Gearing Up for Growth in Zambia
October 2021
Climate Change Effects on Rainfall Extremes and Implications for Highway Drainage Structures
October 2021
Knight Piésold, aliado de la minería sustentable