INTRODUCTION
The Neckartal Dam Project is currently under construction on the Fish River near Keetmanshoop in Namibia. The main purpose of the dam is to form an impoundment of 857 million m3 that will supply irrigation water to 5000 ha of agricultural development in the Karas Region. The outlet works at the dam is also equipped with a mini hydropower facility (3MW), which generates from the ecological releases made.

The dam wall is a 78,5m high mass gravity structure, aligned on a curved upstream axis and constructed using a zoned roller compacted concrete (RCC) mix. The crest length measures approximately 520m from abutment to abutment. The dam is equipped with a 395m long uncontrolled ogee spillway crest, which is divided into two segments. The main spillway defining full supply level (FSL) at 787,5 mASL is 290m long, and caters for flood peaks between the 5 to 10-year AEP (Annual Exceedance Probability) flood event. The raised spillway segment at 789,9 mASL is 105m long, positioned on the right flank for passage up to the SED (Safety Evaluation Discharge) and was specifically designed to reduce flow down the abutment that caused circulating flow downstream of the apron.

The dams structural section is a conventional gravity profile with sloped upstream face, 1:0,2 (V:H) and a stepped downstream face, defined on a slope of 1:0,75 (V:H). The dam is presently under construction by Salini Impregilo and will contain some 900 000 m3 of RCC upon construction completion.

The project site is located in a semi-arid region, known for its hot desert climate with long, very hot summers and moderate to warm winters. Average monthly temperatures vary over approximately 14ºC throughout the year between winter and summer. Considering this temperature variation and owing to the size and significance of the structure, strict temperature controls are being enforced, achieved by restricting the allowable RCC placement temperature to 28ºC by means of a dedicated aggregate chilling plant.

In this paper, the authors present a summary of the related thermal analyses applied for the design of Neckartal  Dam, undertaken to determine the magnitude of the anticipated thermal stresses that will develop and ultimately, to evaluate the potential for cracking within the RCC dam. In this manner, the typical approach and techniques required for a transient thermal and stress analysis of a major RCC dam is demonstrated.

 

Download the full technical paper.

Download

 

Recent Insights

May 2023
Is the Implementation of Dry Stacking for Tailings Storage Increasing? A Southern African Perspective
February 2023
Canadian Consulting Engineer's Lifetime Achievement Awards: Jeremy Haile
February 2023
Geotechnical Characterization of Collapsible Salty Sands Subjected to Monotonic and Cyclic Loadings – A Case Study for Areas with High Seismicity
November 2022
Application of the 3D Limit Equilibrium Method in Tailings Dam Breach Analysis
November 2022
Evaluation of Tailings Behaviour for Dam Breach Assessments
November 2022
Tailings Improvement by Stress-Densification from Waste Rock Capping
November 2022
Transforming Tailings Management Systems toward Alignment with the GISTM: A Case History
October 2022
Managing Excessive Pit Wall Deformation of Weak Rock Mass
October 2022
State-of-the-art Method for Estimating Long-term Hydroclimatic Conditions for Tailing Dam Water Management and Dam Safety Planning
August 2022
Observed Subsidence Progression at New Afton Mine in Response to Lift 1 Mining
June 2022
Hydrometric Monitoring and Effluent Discharge Mixing in Challenging Natural Conditions
May 2022
Inundation Modelling of Non-Newtonian Tailings Dam Breach Outflows
May 2022
Video: Tailings Management Compliancy Picks Up Momentum
May 2022
A Catch up with...Richard Elmer
February 2022
Engineer of Record Services for Tailings Facilities
November 2021
Knight Piésold's Projects Commended at Prestigious Awards
November 2021
Advances in Ensuring Tailings Dam Safety
November 2021
Gearing Up for Growth in Zambia
October 2021
Climate Change Effects on Rainfall Extremes and Implications for Highway Drainage Structures
October 2021
Knight Piésold, aliado de la minería sustentable